Manufacturing · Dongguan, China
Development into Production
Technical development, sampling and manufacturing connected by over 30 years of knitwear experience.
Request a Project Review
From development to production
A controlled handover, not a disconnected sequence.
Sampling tests the technical decisions before an approved specification moves into bulk production.
Yarn & Material
Hand-feel, stitch definition, colour, garment weight, lead time and project economics guide the yarn decision.


Knit Development
Structure, gauge, measurements, artwork and shaping are resolved as one practical technical system.
Knitting & Construction
Approved panels move through flat knitting, linking and assembly with measurements and pattern placement controlled.

Finishing
Washing, pressing, trimming, embellishment coordination and final presentation are confirmed for each garment.
Quality Control
Quality control is integrated at defined production stages.
QC reports may be shared where appropriate for the project.

- Incoming material inspection
- Inline production inspection
- Final inspection
Production planning
Sampling to bulk, with the project defined first.
Sample development typically takes approximately 7–15 days depending on yarn availability and construction complexity. Bulk lead time is discussed according to the specific project.
Sampling
7–15 days
Typical MOQ
300–500 pcs / style
Selected higher-value developments may sometimes be considered at lower quantities depending on yarn, construction and project economics.
Primary Terms
FOB
CIF / DDP may be discussed depending on project requirements.
Project fit
Bring the development brief into focus.
Share your references, product direction, target quantity and timing. Omes will review the technical and commercial suitability of the project.
Review the knitwear capabilities available for development.